Cameron County PA

Do you have some news, announcements, photos, items of interest ? Send them in !

Cameron County PA News will be happy to post these for you.

Contact me @ cameroncountypaonline@gmail.com.

You may also comeback from time to time by adding http://cameroncountynews.blogspot.com to your favorites list.

Monday, August 10, 2026

This week -Oil & Chip on Rt 155, the Old West Creek Rd & Rich Valley Rd.

 

This week -oil & chip on Rt 155, the Old West Creek Rd & Rich Valley Rd.

Cameron County Maintenance Work Schedule for the Week of August 10 Clearfield, PA 

The Pennsylvania Department of Transportation (PennDOT) announced the following schedule of maintenance activities in Cameron County the week of August 10.

 PennDOT performs year-round maintenance in its mission to provide a safe, efficient transportation system, and the scope of work in Cameron County for the coming week is as follows: Surface Treatment All of Route 155. Monday, August 10, through Friday, August 14. 

Flaggers in the roadway will provide traffic control during daylight hours and may deploy a pilot vehicle. When encountering a pilot vehicle with a “Pilot Car Follow Me” sign mounted on the rear and a revolving yellow light, drivers must remain behind it until it has left the roadway. Do not pass.

 All of Route 4001 (Old West Creek Road) in Shippen Township. Monday, August 10, through Friday, August 14. Flaggers in the roadway will provide traffic control during daylight hours and may deploy a pilot vehicle. When encountering a pilot vehicle with a “Pilot Car Follow Me” sign mounted on the rear and a revolving yellow light, drivers must remain behind it until it has left the roadway. Do not pass. 

All of Route 4004 (Rich Valley Road) in Shippen Township. Monday, August 10, through Friday, August 14. Flaggers in the roadway will provide traffic control during daylight hours and may deploy a pilot vehicle. When encountering a pilot vehicle with a “Pilot Car Follow Me” sign mounted on the rear and a revolving yellow light, drivers must remain behind it until it has left the roadway. Do not pass.

 Commonly known as “oil and chip” or “sealcoat,” this operation is a preservation strategy used to maintain mainly low-traffic-volume roads for five to seven years. It is also used on high-volume roads to extend pavement life between resurfacings. Generally, it takes stones about two days to fully bond in the hardened asphalt. Motorists should reduce their speed on these roads until the stones fully adhere to the asphalt. This maintenance seals the road surface to keep water out, restores the friction of the surface to enhance traction, and is very cost-effective. This schedule is subject to change due to weather conditions, emergencies, or other unforeseen interruptions.

No comments:

Post a Comment