Elk State Forest
East Cowley Run Road Closed starting 5/12/2025
The Elk State Forest will be paver placing limestone on the East Cowley Run Road starting Monday, May 12. The project will likely take three days, with an additional two to three day closure period for curing the material. The area closed will be one-half mile from the Sizerville State Park boundary to Bear Pen Hollow, approximately 3.2 miles from the Ridge Road intersection.
Limestone driving surface aggregate (DSA) is used to protect waterways, as it produces a more solid road surface less prone to mud and erosion.
No comments:
Post a Comment