PennDOT Cameron County Maintenance Work Schedule for the Week
of September 21
Clearfield, PA – The Pennsylvania Department of Transportation (PennDOT)
announced the following schedule of maintenance activities in Cameron County the
week of September 21.
PennDOT performs year-round maintenance in its mission to
provide a safe, efficient transportation system, and the scope of work in Cameron
County for the coming week is as follows:
Patching
All of Route 2001 (Wykoff Run Road). Monday, September 21, through Friday,
September 25.
Flaggers in the roadway will provide traffic control during daylight
hours.
Flaggers in the roadway will provide traffic control during daylight hours
and may deploy a pilot vehicle. When encountering a pilot vehicle with a “Pilot
Car Follow Me” sign mounted on the rear and a revolving yellow light, drivers
must remain behind it until it has left the roadway. Do not pass.
Most permanent pothole patching is completed in spring or summer when temperatures
stay consistently above freezing. Manual patching consists of filling potholes with warm
mix asphalt using a shovel. It is then leveled and compacted. Mechanized patching
consists of milling paving notches, cleaning the surface, applying tack to all edges to act
as a glue. A paver then places warm mix into the milled paving notches, and a roller
compacts the material. If patching was not performed, the damaged road surface would
deteriorate further, and PennDOT would need to completely rebuild the road or perform
more costly corrective measures.
This schedule is subject to change due to weather conditions, emergencies, or
other unforeseen interruptions.
For more information on PennDOT’s maintenance activities, visit
https://www.pa.gov/agencies/penndot/about-penndot/strategic-planning-and-
operations/penndot-maintenance-activities
Drivers can check conditions on major roadways by visiting www.511PA.com. 511PA,
which is free and available 24 hours a day, provides traffic delay warnings, weather
forecasts, traffic speed information and access to more than 1,200 traffic cameras.
511PA is also available through a smartphone application for iPhone and Android
devices, by calling 5-1-1, or by following regional X alerts.
Find PennDOT’s planned and active construction projects at www.pa.gov/DOTprojects.
Subscribe to PennDOT news and find transportation results in Cameron, Centre,
Clearfield, Clinton, Elk, Juniata, McKean, Mifflin, and Potter counties at
www.pa.gov/DOTdistrict2.
Find PennDOT news on X, Facebook, and Instagram.
No comments:
Post a Comment